Support, Grow, Contribute
All About Renewables

Renewable Energy

Find latest News, Industry Updates, Markets, Finance, Policies and Regulations, Tenders

Uttarakhand Renewable Energy Tariff Regulations - 2013

  • / /

HIGHLIGHTS

 

Tariff Period

Technology

No. of Years

Small hydro

35

Wind, solar PV, solar thermal, grid-interactive rooftop, small solar PV plants, solar PV plants on canal-bank or canal-top.

25

Biomass, non-fossil fuel based cogeneration, biomass gasifier, biogas, MSW, RDF.

20

 

Control Period

5 years, of which the first year is FY2013-14. 

Useful Life of a Plant

Similar to tariff period. 

Technology-wise Net Tariff

Technology

Net Tariff (in Rs./kWh)

Small hydro (up to 5 MW)

3.92

Small hydro (above 5 and up to 15 MW)

3.72

Small hydro (above 15 and up to 25 MW)

3.44

Biomass (fixed charges)

2.00

Non-fossil fuel based cogeneration (fixed charges)

2.70

Biomass gasifier (fixed charges)

2.10

Biogas (fixed charges)

3.50

MSW (fixed charges)

6.70

RDF (fixed charges)

4.10

Solar PV

10.15

Solar thermal

12.15

Grid-interactive rooftop and small solar PV plants

8.15

Canal-bank solar PV

6.70

Canal-top solar PV

7.65

Wind (Zone – 1)

5.00

Wind (Zone – 2)

4.45

Wind (Zone – 3)

3.80

Wind (Zone – 4)

3.05

Wind (Zone – 5)

2.80

 

Capital Cost

Technology

 

Capital Cost (in Rs. lakh/MW)

Small hydro (up to 5 MW)

785.00

Small hydro (above 5 and up to 15 MW)

750.00

Small hydro (above 15 and up to 25 MW)

715.00

Biomass

445.00

Non-fossil fuel based cogeneration

420.00

Biomass gasifier

550.00

Biogas

1100.00

MSW

1500.00

RDF

900.00

Solar PV

1000.00

Solar thermal

1300.00

Grid-interactive rooftop and small solar PV plants

1025.00

Canal-bank solar PV

6.85

Canal-top solar PV

7.05

Wind

515

 

Operation and Maintenance Expenses (O&M)

Technology

O&M Cost (in Rs. lakh/MW or % of project cost for FY 2013-14)

Small hydro (up to 5 MW)

26.43

Small hydro (above 5 and up to 15 MW)

22.73

Small hydro (above 15 and up to 25 MW)

19.03

Biomass

25.37

Non-fossil fuel based cogeneration

16.92

Biomass gasifier, biogas

42.29

MSW

90.00* 

RDF

54.00* 

Solar PV, canal-bank solar PV, canal-top solar PV, grid-interactive rooftop and small solar PV plants.

11.63

Solar thermal

15.86

Wind

9.51

MSW, RDF

6%

*Cost are from FY 2016-17 

Interest Rate on Loans

Average State Bank of India base rate prevalent during first 6 months of the previous year plus 300 basis points.

Depreciation

  • 5.83% per annum for the first 12 years and the remaining depreciation spread over the residual useful life of the project.
  • 75% of the capital subsidy received by the generator shall be reduced from the capital cost for depreciation purposes.

Return on Equity

  • Pre-tax - 20% per annum for the first 10 years.
  • Pre-tax - 24% per annum from the 11th year onwards.

(Uttarakhand Electricity Regulatory Commission (Tariff and other terms for supply of electricity from renewable energy sources and non fossil fuel based cogeneration stations) (First Amendment) Regulations, 2013 

Interest on Working Capital

Average State Bank of India base rate prevalent during the first six months of the previous year plus 350 basis points.

 

OTHER PROVISIONS

 

Tariff structure and design

Single-part tariff, with fixed cost components and variable cost components for technologies using fuels.

Merit Order Despatch

Merit order dispatch/purchase shall not be applicable.

Subsidy or/and incentives by government

Incentives or subsidies offered by the central or state government shall be considered by the Commission while determining tariff; provided that only 75% of the capital subsidy for the financial year of commissioning shall be considered for tariff determination.

Rebate

  • 2% rebate for payment through letter of credit.
  • 1% rebate for payment other than through letter of credit and within 1 month of the presentation of bills.

Late payment surcharge

1.25% per month, or part thereof, for payment beyond 60 days from the date of billing.

 

Links

http://www.uerc.gov.in/

References

http://www.uerc.gov.in/Rules%20and%20regulation/UERCRegulations/Regulations%202013/English%20
Regulations,%202013/UERC(RE%20cogen%20stations)%20Reg,%202013.pdf

 

http://www.uerc.gov.in/Rules%20and%20regulation/UERCRegulations/Regulations%202013/English%20
Regulations,%202013/UERC%20(RE)%20(1st%20Amend)%20Regulations,%202013.pdf

 

http://www.uerc.gov.in/Rules%20and%20regulation/UERCRegulations/Regulations2014/Second%20Amendment
%20to%20RE%20Regulations,%202010%20&%202013/UERC%20RE%20Regulations,%202014_Second%20
Amendment_to_principal%20reg2010_English.pdf

 

http://www.uerc.gov.in/Rules%20and%20regulation/UERCRegulations/Regulations,%202015/RE%203rd%20
amendment%20Regulations,%202015/UERC%20RE%20Reg.%202015_3%20rd%20amend.pdf

 

http://www.uerc.gov.in/Rules%20and%20regulation/UERCRegulations/Regulations,%202015/RE%20Fourth%20
Amendment%20Regulations,%202015/RE%20Fourth%20Amendment%20Regulations,%202015_gazett.pdf

 

http://www.uerc.gov.in/Rules%20and%20regulation/UERCRegulations/Regulations%202016/UERC%20
Fifth%20Amendment%20Regulatoins,%202016.pdf

 

About Portal

'All About Renewables' aims to bring about a change in the way we 'look and search' for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More

Contact

Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India

+91 20 26613855
+91 20 26613832