Tariff Period |
Technology |
No. of Years |
|||||||||
Wind, solar PV, solar thermal, grid interactive rooftop and small solar PV plants, solar PV power plants on canal-bank/canal-top. |
25 |
||||||||||
Biomass Rankine cycle, biomass gasifier, biogas, non-fossil fuel based co-generation, municipal solid waste and refuse-derived fuel projects. |
20 |
||||||||||
Small hydro power projects. |
35 |
||||||||||
|
|||||||||||
Control Period |
Five years, of which the first year shall be 2018-19. |
||||||||||
Useful Life of a Plant |
Technology |
No. of Years |
|||||||||
Wind, solar PV, solar thermal, grid interactive rooftop and small solar PV plants, solar PV power plants on canal-bank/canal-top. |
25 |
||||||||||
Biomass Rankine cycle, biomass gasifier, biogas, non-fossil fuel based co-generation, municipal solid waste and refuse derived fuel based projects. |
20 |
||||||||||
Small hydro power projects. |
35 |
||||||||||
|
|||||||||||
Technology-wise Tariff |
Technology |
Net Tariff (Rs./kWh) |
|||||||||
Small hydro projects (40% CUF) (Gross Tariff). |
Up to 5 MW. |
6.33 |
|||||||||
Above 5 MW and up to 15 MW. |
6.08 |
||||||||||
Above 15 MW and up to 25 MW. |
5.70 |
||||||||||
Small hydro projects (45% CUF) (Gross Tariff). |
Up to 5 MW. |
5.63 |
|||||||||
Above 5 MW and up to 15 MW. |
5.40 |
||||||||||
Above 15 MW and up to 25 MW. |
5.07 |
||||||||||
MSW (Fixed charges). |
6.59 |
||||||||||
RDF (Fixed charges). |
4.27 |
||||||||||
Non-fossil fuel based co-generation (Fixed charges). |
3.52 |
||||||||||
Biomass gasifier (Fixed charges). |
Pine leaf based |
4.16 |
|||||||||
Others |
2.82 |
||||||||||
Biogas projects (Fixed charges). |
4.09 |
||||||||||
Canal-bank solar projects. |
6.29 |
||||||||||
Canal-top solar projects. |
6.51 |
||||||||||
Solar PV. |
4.48 |
||||||||||
Solar thermal. |
13.26 |
||||||||||
Grid interactive rooftop and small solar PV. |
Up to 10 kW |
0% subsidy |
5.62 |
||||||||
30% subsidy |
4.92 |
||||||||||
70% subsidy |
4.00 |
||||||||||
90% subsidy |
3.63 |
||||||||||
Above 10 kW up to 100 kW. |
0% subsidy |
5.09 |
|||||||||
30% subsidy |
4.39 |
||||||||||
70% subsidy |
3.48 |
||||||||||
90% subsidy |
3.19 |
||||||||||
Above 100 kW up to 500 kW. |
0% subsidy |
4.72 |
|||||||||
30% subsidy |
4.12 |
||||||||||
70% subsidy |
3.33 |
||||||||||
90% subsidy |
3.01 |
||||||||||
Above 500 kW up to 1 MW. |
0% subsidy |
4.51 |
|||||||||
30% subsidy |
3.93 |
||||||||||
70% subsidy |
3.17 |
||||||||||
90% subsidy |
2.86 |
||||||||||
Wind |
Zone 1 |
4.38 |
|||||||||
Zone 2 |
4.02 |
||||||||||
Zone 3 |
3.44 |
||||||||||
Zone 4 |
2.92 |
||||||||||
Zone 5 |
2.75 |
||||||||||
Biomass [other than rice straw and juliflora (plantation)] based projects with air cooled condenser based on travelling grate boilers (Fixed charges). |
3.12 |
||||||||||
Biomass [for rice straw and juliflora (plantation)] based projects with air cooled condenser based on travelling grate boilers (Fixed charges). |
3.25 |
||||||||||
Biomass [other than rice straw and juliflora (plantation)] based projects with water cooled condenser based on travelling grate boilers (Fixed charges). |
2.95 |
||||||||||
Biomass [for rice straw and juliflora (plantation)] based projects with water cooled condenser based on travelling grate boilers (Fixed charges) |
3.08 |
||||||||||
Biomass [other than rice straw and juliflora (plantation)] based projects with air cooled condenser based on AFBC boilers (Fixed charges). |
3.11 |
||||||||||
Biomass [for rice straw and juliflora (plantation)] based projects with air cooled condenser based on AFBC boilers. |
3.25 |
||||||||||
Biomass [other than rice straw and juliflora (plantation)] based projects with water cooled condenser based on AFBC boilers (Fixed charges). |
2.94 |
||||||||||
Biomass [for rice straw and juliflora (plantation)] based projects with water cooled condenser based on AFBC boilers (Fixed charges). |
3.07 |
||||||||||
|
|||||||||||
Capacity Utilization Factor (CUF)/Plant Load Factor (PLF) |
Technology |
CUF/PLF(%) |
|||||||||
Wind energy |
Annual mean wind power density (W/m2) |
CUF (%) |
|||||||||
Up to 220 |
22 |
||||||||||
221-275 |
24 |
||||||||||
276-330 |
28 |
||||||||||
331-440 |
33 |
||||||||||
Over 440 |
35 |
||||||||||
Small hydro generating plant |
Up to 5 MW. |
Generic tariff – 40. Project specific tariff – 45. |
|||||||||
Greater than 5 MW and up to 15 MW. |
|||||||||||
Greater than 15 MW and up to 25 MW. |
|||||||||||
Biomass based on Rankine cycle. |
Stages |
PLF (%) |
|||||||||
Stabilization - maximum up to 6 months. |
60 |
||||||||||
After stabilization - up to 1 year |
70 |
||||||||||
Beyond 1 year |
80 |
||||||||||
Bagasse based co-generation. |
45 |
||||||||||
Biomass gasifier. |
85 |
||||||||||
Biogas. |
90 |
||||||||||
Solar PV. |
19 |
||||||||||
Canal-bank solar PV. |
19 |
||||||||||
Canal-top solar PV. |
19 |
||||||||||
Solar thermal project. |
23 |
||||||||||
Grid interactive and rooftop solar plants. |
19 |
||||||||||
MSW/RDF based on Rankine cycle. |
Stages |
PLF (%) |
|||||||||
MSW |
RDF |
||||||||||
Stabilization - maximum up to 6 months. |
65 |
65 |
|||||||||
After stabilization - up to 1 year. |
65 |
65 |
|||||||||
Beyond 1 year |
75 |
80 |
|||||||||
* Commission may deviate in case of project specific tariff. |
|||||||||||
Auxiliary Consumption |
Technology |
Aux. Cons. (%) |
|||||||||
Small hydro generating plant |
Up to 5 MW. |
1 |
|||||||||
Greater than 5 MW and up to 15 MW. |
|||||||||||
Greater than 15 MW and up to 25 MW. |
|||||||||||
Biomass based on Rankine cycle (water cooled condenser). |
Stages |
Aux. Con. (%) |
|||||||||
1st year. |
11 |
||||||||||
2nd year onwards. |
10 |
||||||||||
Biomass based on Rankine cycle (air cooled condenser). |
1st year. |
13 |
|||||||||
2nd year onwards. |
12 |
||||||||||
Non-fossil fuel based co-generation. |
8.5 |
||||||||||
Biomass gasifier. |
Pine leaf based |
10 |
|||||||||
Others |
10 |
||||||||||
Biogas. |
12 |
||||||||||
Solar thermal. |
10 |
||||||||||
MSW/RDF based on Rankine cycle. |
15 |
||||||||||
*Commission may deviate in case of project specific tariff |
|||||||||||
Capital Cost |
Technology |
Capital Cost (in Rs. lakh/MW) |
|||||||||
Wind energy |
515.00 |
||||||||||
Small hydro generating plant |
Up to 5 MW. |
1000.00 |
|||||||||
Greater than 5 MW and up to 15 MW. |
950.00 |
||||||||||
Greater than 15 MW and up to 25 MW. |
900.00 |
||||||||||
Biomass [other than rice straw and juliflora (plantation)] based projects with air cooled condenser. |
600.44 |
||||||||||
Biomass [for rice straw and juliflora (plantation)] based projects with air cooled condenser. |
652.20 |
||||||||||
Biomass [other than rice straw and juliflora (plantation)] based projects with water cooled condenser. |
559.03 |
||||||||||
Biomass [for rice straw and juliflora (plantation)] based projects with water cooled condenser. |
610.80 |
||||||||||
Non-fossil fuel based co-generation. |
492.50 |
||||||||||
Solar PV. |
388.19 |
||||||||||
Canal-top solar PV. |
625.00 |
||||||||||
Canal-bank solar PV. |
600.00 |
||||||||||
Solar thermal. |
1200.00 |
||||||||||
Grid interactive rooftop and small solar PV plants (Rs. /kW). |
Up to 10 kW. |
47153.00 |
|||||||||
More than 10 kW and up to 100 kW. |
43224.00 |
||||||||||
More than 100 kW and up to 500 kW. |
40612.00 |
||||||||||
More than 500 kW and up to 1 MW. |
39135.00 |
||||||||||
Biomass gasifier based on Rankine cycle. |
Pine leaf based. |
625.00 |
|||||||||
Others |
592.88 |
||||||||||
Biogas. |
1185.00 |
||||||||||
MSW based on Rankine cycle. |
1500.00 |
||||||||||
RDF based on Rankine cycle. |
900.00 |
||||||||||
|
|||||||||||
Operations and Maintenance (O&M) Expenses |
Technology |
O&M Expenses (Rs. lakh/MW) for Year of Commissioning |
|||||||||
Wind energy |
9.51 |
||||||||||
Small hydro generating plant
|
Up to 5 MW. |
45.00 |
|||||||||
Greater than 5 MW and up to 15 MW. |
40.38 |
||||||||||
Greater than 15 MW and up to 25 MW. |
36.00 |
||||||||||
Solar PV. |
12.30 |
||||||||||
Canal-bank solar PV. |
12.30 |
||||||||||
Canal-top solar PV. |
12.30 |
||||||||||
Solar thermal. |
16.77 |
||||||||||
Grid interactive rooftop and small solar PV plants (Rs./kW). |
Up to 10 kW. |
1627.00 |
|||||||||
More than 10 kW and up to 100 kW. |
1448.00 |
||||||||||
More than 100 kW and up to 500 kW. |
1320.00 |
||||||||||
More than 500 kW and up to 1 MW. |
1230.00 |
||||||||||
Biomass based on Rankine cycle. |
42.29 |
||||||||||
Biomass gasifier. |
Pine leaf based. |
100.00 |
|||||||||
Others |
55.85 |
||||||||||
Biogas. |
55.85 |
||||||||||
Non-fossil fuel based co-generation. |
22.35 |
||||||||||
MSW based on Rankine cycle. |
6% of the project cost for the first year. |
||||||||||
RDF based on Rankine cycle. |
6% of the project cost for the first year. |
||||||||||
|
|||||||||||
Interest Rate on Loan |
|
||||||||||
Depreciation |
5.38% per annum for the first 13 years and balance depreciation will be spread over the remaining useful life of the project.
|
||||||||||
Return on Equity |
|
||||||||||
Interest on Working Capital |
|
||||||||||
Station Heat Rate (SHR) |
Technology |
SHR (kCal/kWh) |
|||||||||
Biomass with Rankine cycle. |
Travelling grate boilers. |
4200 |
|||||||||
AFBC boilers. |
4125 |
||||||||||
Non-fossil fuel based co-generation. |
3600 |
||||||||||
MSW/RDF. |
4200 |
||||||||||
|
|||||||||||
Gross Calorific Value (GCV) |
Technology |
GCV (kCal/kg) |
|||||||||
Biomass. |
3100 |
||||||||||
Bagasse based co-generation. |
2250 |
||||||||||
RDF |
2500 |
||||||||||
|
|||||||||||
Specific Fuel Consumption (SFC) |
Technology |
SFC (kg/kWh) |
|||||||||
Biomass gasifier. |
Pine leaf based. |
1.50 |
|||||||||
Others. |
1.25 |
||||||||||
Biogas |
3.00 |
||||||||||
|
|||||||||||
Fuel Cost |
Technology |
Fuel Cost (Rs./MT) (FY 2018-19) |
|||||||||
Biomass |
2355 |
||||||||||
Bagasse |
1954 |
||||||||||
RDF |
1800 |
||||||||||
|
OTHER PROVISIONS |
Renewable Purchase Obligations |
Year |
Non-solar & Solar RPO |
|
|
|
||
Non-solar |
Solar |
||
2018-19 |
10.25% |
6.75% |
|
2019-20 |
10.25% |
7.25% |
|
2020-21 |
10.25% |
8.75% |
|
2021-22 |
10.50% |
10.50% |
|
2022-23 |
11.00% |
11.00% |
|
|
|||
Tariff Structure and Design |
|
||
Merit Order Dispatch Principle |
Not applicable to supply of power from renewable energy sources to the distribution licensee or local rural grids within the state.
|
||
Subsidy or/and Incentives by Government |
Any incentive or subsidy offered by the government including accelerated depreciation benefit shall be considered. |
||
Taxes and Duties |
|
||
Rebate |
|
||
Late Payment Surcharge |
|
||
Transmission and Wheeling Charges and Losses |
|
||
Evacuation of Power |
|
||
Connectivity and Metering Arrangement for Grid Interactive Rooftop and Small Solar PV Plants |
|
||
Metering Arrangement |
|
||
Banking of Power |
|
||
Links |
http://www.uerc.gov.in/Rules%20and%20regulation/UERCRegulations/UERC%20Current%20Regulations.html
|
||
References |
|
About Portal
'All About Renewables' aims to bring about a change in the way we 'look and search' for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More
About
Useful Links
Contact
Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India
+91 20 26613855
+91 20 26613832