Renewable Energy
Find latest News, Industry Updates, Markets, Finance, Policies and Regulations, Tenders
HIGHLIGHTS |
Control Period | From the date of publication in the official gazette of Tripura. |
Eligible Consumer | Any consumer in the supply area of the distribution licensee. |
Capacity Target for Distribution Transformer | Cumulative capacity of solar rooftop systems should not exceed 15% of the rated capacity of the concerned distribution transformer provided thatthe distribution licensee may allow net metering connectivity exceeding 15% of rated capacity based on a detailed load study. |
Metering Arrangement |
|
OTHER PROVISIONS |
Energy accounting and settlement |
|
Other charges | Systems shall be exempted from wheeling, banking, cross subsidy and other charges for five years, unless extended thereafter. |
Penalty | Not available |
Link | http://terc.nic.in/rules_regulation.htm |
Reference | http://terc.nic.in/TERC%20Net%20metering%20Gazette.pdf |
About Portal
'All About Renewables' aims to bring about a change in the way we 'look and search' for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More
About
Useful Links
Contact
Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India
+91 20 26613855
+91 20 26613832