Eligibility to seek Open Access | If contracted capacity greater than 1 MW. | |
Electricity Tariff FY 2016-17 | HT (I) Industrial | (Rs/Unit) |
11 kV | 6.65 | |
33 kV | 6.15 | |
132 kV and above | 5.65 | |
Ferro Alloy Units |
| |
11 kV | 5.90 | |
33 kV | 5.50 | |
132 kV and above | 5.00 | |
HT (II) Others |
| |
11 kV | 7.80 | |
33 kV | 7.00 | |
132 kV and above | 6.80 | |
HT (VIII) RESCO | 1.00 | |
Connectivity charges and procedure | Licensee can recover, within a reasonable time, the costs, the capital investment and a reasonable rate of return on the capital investment in respect of the augmentation. Licensee may require the open access user to make a capital contribution towards such network augmentation. | |
Nodal Agency |
| |
Procedure and Charges for Long Term Open Access |
| |
Procedure and Charges for Medium Term Open Access | -NA- | |
Procedure and Charges for Short Term Open Access |
| |
Open Access Duration | Maximum Processing Time | |
Up to one day | 12 hours | |
Up to one week | 2 days | |
Up to one month | 7 days | |
Up to one year | 30 days | |
In case of applicants for STOA, with transactions requiring to be accommodated through congested corridors of the network, the nodal agency shall invite bids with floor price equal to the uncongested price for the short-term user. |
OTHER PROVISIONS |
Allotment priority |
| ||||||||
Open Access charges | If the existing consumer is availing of open access which is within the contracted demand of the licensee (Open access demand + actual demand availed from licensee is within the CMD), the licensee shall not charge wheeling and transmission charges for such open access availed.
Cross Subsidy Surcharge (Rs./Unit) FY 2016-17 | ||||||||
| Telangana State Southern Power Distribution Company Ltd (TSSPDCL) | Telangana State Northern Power Distribution Company Ltd (TSNPDCL) | |||||||
HT I – 11 kV | 1.65 | 1.66 | |||||||
HT I Industry 33 kV | 1.48 | 1.44 | |||||||
HT I Industry 132 kV and above | 1.35 | 1.34 | |||||||
Scheduling and Metering | Scheduling:
Metering:
| ||||||||
Energy Losses | Transmission Losses: | ||||||||
| Transmission Loss (kind) | Transmission charges (Rs./kW/month) | |||||||
2016-17 | 4.01% | 91.36 | |||||||
2017-18 | 3.98% | 95.37 | |||||||
2018-19 | 3.95% | 94.44 | |||||||
Wheeling Losses: | |||||||||
| TSSPDCL - FY 2016-17 (FY 2017-18) | TSNPDCL - FY 2016-17 (FY 2017-18) | |||||||
Supply | 33 kV | 11 kV | 33 kV | 11 kV | |||||
Drawal 33 kV | 3.99% (3.99%) | 8.31% (8.21%) | 4.00% (4.00%) | 8.06% (8.03%) | |||||
Drawal 11 kV | 8.31% (8.21%) | 8.31% (8.21%) | 8.06% (8.03%) | 8.06% (8.03%) | |||||
Imbalance and Reactive Energy Charges | Imbalance Energy (Underdrawal):
Reactive Energy charges:
Banking of Renewable Energy (Wind/Solar/Mini-hydel):
| ||||||||
Link | http://www.tserc.gov.in/draft.php | ||||||||
Reference | Andhra Pradesh Electricity Regulatory Commission (Terms and Condition for Open Access) Regulations, 2005: http://www.tserc.gov.in/file_upload/uploads/Regulations/Final/2%20of%202005.pdf Draft (Interim Balancing and Settlement Code for Open Access Transactions) Third Amendment Regulation, 2016: http://www.tserc.gov.in/file_upload/uploads/Regulations/Draft/2016/Third%20Amendment_%20IBS%20Reg%20No%202%20of%202006.pdf Wheeling Tariff Schedule for FY 14-15 to FY 18-19: http://www.tserc.gov.in/file_upload/uploads/Tariff%20Orders/Tariff%20Schedule/Wheeling%20charges%20FY%202015-16.pdf Tariff Schedule FY 16-17: http://www.tserc.gov.in/file_upload/uploads/Tariff%20Orders/Tariff%20Schedule/RTS2016-17.pdf Transmission Tariff Order FY 16-17 : http://www.tserc.gov.in/file_upload/uploads/Tariff%20Orders/Current%20Year%20Orders/transmissiontarifforderfor3rdcontrolperiod.pdf |
About Portal
'All About Renewables' aims to bring about a change in the way we 'look and search' for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More
About
Useful Links
Contact
Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India
+91 20 26613855
+91 20 26613832