HIGHLIGHTS

 

Technology-wise Net Tariff

 

Technology

Net Tariff (Rs./kWh)

Wind (Jaisalmer, Barmer, Jodhpur)

5.16

Wind (other than Jaisalmer, Barmer, Jodhpur)

5.42

Solar PV

4.85

Solar thermal

10.34

Biomass with water-cooled condenser

6.83*

Biomass with air-cooled condenser

7.41*

Biogas

7.84*

Biomass gasifier

6.67*

*Without availing Accelerated Depreciation

 

Project developer can opt for project-specific tariff for the following:

  • Biomass gasifier.
  • Biogas.
  • MSW and Refuse Derived Fuel based project with a Rankine cycle.
  • Hybrid.
  • Project under the Central/State government scheme.

Tariff Period

 

Technology

No. of Years

Wind, Solar PV, Solar thermal

25

Biomass, Biomass gasifier, Biogas

20

Control Period

 

  • 01.04.2014 to 31.03.2019 for wind and solar projects.
  • 01.04.2015 to 31.03.2020 for biomass and biogas projects.

Useful Life of a Plant

 

Technology

No. of Years

Wind, Solar PV, Solar thermal

25

Biomass, Biomass gasifier, Biogas

20

Capital Cost

 

Technology

Rs. Lakh/MW

Wind

579.84

Solar PV

518.59

Solar thermal

1182.30

Biomass with water-cooled condenser

527.78

Biomass with air-cooled condenser

561.98

Biogas

856.77$

Biomass gasifier

443.49*

*Subsidy of Rs.150 lakh/MW

$Subsidy of Rs.300 lakh/MW

Operation and Maintenance (O&M) Expenses

 

Technology

Rs. Lakh/MW

Wind

8.82

Solar PV

7.00

Solar thermal

18.79

Biomass with water-cooled condenser

42.27

Biomass with air-cooled condenser

45.07

Biogas

56.06

Biomass gasifier

56.06

The escalation in O&M is 5.85% per annum.

Interest Rate on Loans

12.76%

Depreciation

 

  • 5.83% for the first year and remaining depreciation shall be spread over the residual useful life of the plant.
    • 5.28% for biogas and biomass for the first 13 years and remaining depreciation shall be spread over the residual useful life of the plant.

Return on Equity

 

  • 14% per annum for biogas, biomass gasifier and biomass.
  • 16% per annum for other technologies.

Interest on Working Capital

 

  • 12.50% for solar thermal.
  • 12.26% for solar PV.
  • 10.99% for biogas and biomass.

Banking of Energy for Biogas and Biomass

Extra energy fed into the grid will be compensated at 60% of energy charges for the industrial customer.

       

 

OTHER PROVISIONS

 

Tariff Structure and Design

Single part, levelised tariff.

 

Despatch Principle

‘MUST RUN’ plants and hence not subject to merit order despatch principle.

Subsidy or/and Incentives by Government

Any incentive or subsidy provided by the central or state government including accelerated depreciation benefit.

Rebate

 

  • 2% - for payment of bills through a letter of credit or by cash/cheque within three working days of presentation of bills.
  • 1% - for payment of bills through letter of credit or by cash/cheque beyond three working days of presentation of bills but within thirty days.

Late Payment Surcharge

1.25% per month, on a daily basis, for payments beyond 45 days from date of presentation of bills.

Links

http://rerc.rajasthan.gov.in/

 

References

 

http://rerc.rajasthan.gov.in/Regulations/Reg87.pdf

 

http://rerc.rajasthan.gov.in/Regulations/Reg79.pdf

 

http://rerc.rajasthan.gov.in/TariffOrders/Order239.pdf

 

http://rerc.rajasthan.gov.in/TariffOrders/Order249.pdf

 

http://rerc.rajasthan.gov.in/TariffOrders/Order248.pdf

 

http://rerc.rajasthan.gov.in/Regulations/Reg85.pdf

 

http://rerc.rajasthan.gov.in/Regulations/Reg114.pdf

 

http://rerc.rajasthan.gov.in/TariffOrders/Order304.pdf

 

https://rerc.rajasthan.gov.in/rerc-user-files/regulations (1st amendment)

 

 

About Portal

'All About Renewables' aims to bring about a change in the way we 'look and search' for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More

Contact

Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India

+91 20 26613855
+91 20 26613832