Renewable Energy
Find latest News, Industry Updates, Markets, Finance, Policies and Regulations, Tenders
HIGHLIGHTS |
Eligibility to seek Open Access (OA) |
| |||
Electricity Tariff FY 2017-18 | Rs./kVAh | |||
HT Industrial | 6.50 | |||
HT Commercial | 6.50 | |||
EHT Industrial | 6.00 | |||
Connectivity Charges and Procedure |
| |||
Nodal Agency | -As per table given below- | |||
Procedure and Charges for Long Term Open Access (LTOA) |
| |||
Location of Injection and Drawal Point | Nodal Agency | Application Fee | Time Frame for Processing Application | |
Consumer Connected to Distribution System | ||||
Both within the area of the same distribution licensee. | Distribution licensee | Rs.2,00,000
| 20 days. | |
Both within the state but with different licensees. Injection into intra-state transmission system. | STU
| 120 days where system augmentation is not required. 150 days where required. | ||
Consumer Connected to Transmission System | ||||
Both within the intra-state transmission system. Injection point in distribution system within the state. | STU | Rs.2,00,000
| 120 days where system augmentation is not required. 150 days where required. | |
| ||||
Procedure and Charges for Medium Term Open Access (MTOA) |
| |||
Location of Injection and Drawal Point | Nodal Agency | Application Fee | Time Frame for Processing Application | |
Consumer Connected to Distribution System | ||||
Both within the area of the same distribution licensee. | Distribution licensee | Rs.1,00,000 | 20 days | |
Both within the state but with different licensees. Injection into intra-state transmission system within the state. | STU | 40 days | ||
Consumer Connected to Transmission System | ||||
Both within intra-state transmission system. Injection point within distribution system in the state. | STU | Rs.1,00,000 | 20 working days | |
| ||||
Procedure and Charges for Short Term Open Access (STOA) |
| |||
Location of Injection and Drawal Point | Nodal Agency | Application fee | Time Frame for Processing Application | |
Consumer Connected to Distribution System | ||||
Both within the area of the same licensee (distribution). | Distribution licensee | Rs.25,000
| 7 working days if applying for the first time, otherwise 3 days.
| |
Both within the same state but with different distribution licensees. Injection point in intra-state transmission system. | SLDC | |||
Consumer Connected to Transmission System | ||||
Both connected to intra state transmission system. Injection point within distribution system in the state. | SLDC | Rs.25,000
| 7 working days if applying for the first time, otherwise 3 days. |
OTHER PROVISIONS |
Allotment priority |
|
Open Access charges |
Transmission Charges:
Cross Subsidy Surcharge:
Wheeling Charges:
Additional Surcharge:
|
Scheduling and Metering | Scheduling:
Metering:
|
Energy losses | Transmission Losses:
Distribution Losses:
|
Imbalance and Reactive Energy charges | Imbalance Energy Charges:
Reactive Energy Charges:
|
Link | http://mserc.gov.in/regulations.html |
References | The M.S.E.R.C. (Terms and Conditions of Open Access) Regulations, 2012: http://mserc.gov.in/regulations/MSERC_OpenAccess_2012.pdf Distribution Tariff Oder ( FY 17-18): http://www.mserc.gov.in/orders/TariffOrders31032017/Tariff_Order_MePDCL_31032017.pdf Transmission Tariff Order (FY 17-18): http://www.mserc.gov.in/orders/TariffOrders31032017/Tariff_Order_MePTCL31032017.pdf |
About Portal
'All About Renewables' aims to bring about a change in the way we 'look and search' for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More
About
Useful Links
Contact
Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India
+91 20 26613855
+91 20 26613832