Maharashtra Renewable Energy Tariff Orders - 2017

  • / /

HIGHLIGHTS

 

Tariff Period

Technology

No. of Years

Wind, solar PV, small hydro (5 MW to 25 MW), biomass, cogeneration.

13

Solar thermal

25

Small hydro (1 MW to 5 MW).

35

 

Control Period

April 1, 2016 to March 31, 2017

Useful Life of a Plant

Technology

No. of Years

Biomass, cogeneration.

20

Wind, solar.

25

Small hydro project

35

 

Technology-wise Net Tariff

Technology

Net Tariff

(in Rs./kWh)

Wind Zone – 1

4.94

Wind Zone – 2

4.33

Wind Zone – 3

3.63

Wind Zone – 4

3.39

Small hydro project (above 1 MW and up to and including 5 MW).

4.26

Small hydro project (above 5 MW and up to and including 25 MW).

3.68

Biomass projects

7.71

Non–fossil fuel based cogeneration.

6.49

Solar PV

5.41

Solar thermal

10.17

 
Capital Cost

Technology

Capital Cost

(in Rs. lakh/MW)

Wind

608.85

Small hydro project (above 1 MW and up to and including 5 MW).

613.45

Small hydro project (above 5 MW and up to and including 25 MW).

558.13

Biomass projects

500.88

Non–fossil fuel based cogeneration

495.51

Solar PV

530.02

Solar thermal

1200.00

 
Operation and Maintenance (O&M) Expenses

Technology

O&M Cost

(in Rs. lakh)

Wind

9.09

Small hydro project (above 1 MW and up to and including 5 MW).

22.43

Small hydro project (above 5 MW and up to and including 25 MW).

15.88

Biomass projects

27.08

Non–fossil fuel based cogeneration

17.82

Solar PV

13.38

Solar thermal

15.44

 
Interest Rate on Loans

12.54%

Depreciation

5.83% for first 12 years and remaining depreciation spread over the residual useful life of the plant.

Return on Equity

  • For first 10 years – 20.34%.

  • From 11th year onwards – 24.47%.

Interest on Working Capital

13.04%

 

OTHER PROVISIONS

 

Tariff Structure and Design Generic, single part, levellised tariff.
Merit Order Dispatch Principle
  • Renewable energy power projects, except biomass and cogeneration projects, are treated as “MustRun” projects.
  • Biomass and cogeneration projects shall be subject to scheduling and dispatch code as per State Grid Code. 
Subsidy or/and Incentives by government

The Commission shall take into consideration any grant, subsidy or incentive offered by the central or state government or their agencies, including accelerated/additional depreciation benefit, while determining tariff. 

Rebate
  • 2% - for payment through letter of credit.
  • 1% - for payment not through letter of credit, but within 1 month from the date of presentation of bills.
Late payment surcharge

1.25% per month for payment of bills beyond a period of 60 days from the date of billing. 

Links

http://www.mercindia.org.in/Regulations.htm
 

http://www.mercindia.org.in/Orders_2016.htm 

References http://www.mercindia.org.in/pdf/Order%2058%2042/MERC(TandC%20for%20Determination%20of%20RE%20Tariff)
%20Regulations,%202015%20.pdf

http://www.mercindia.org.in/pdf/Order%2058%2042/Order-45%20of%202016-29042016.pdf 

 

 

About Portal

'All About Renewables' aims to bring about a change in the way we 'look and search' for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More

Contact

Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India

+91 20 26613855
+91 20 26613832