Renewable Energy
Find latest News, Industry Updates, Markets, Finance, Policies and Regulations, Tenders
HIGHLIGHTS |
Control Period | From the date of publication in the official gazette. |
Eligibility Condition |
|
Capacity Target for Distribution Licensee | Cumulative capacity allowed at a particular distribution transformer shall not exceed 30% of the peak capacity of the distribution transformer. |
Metering Arrangement | Until bi-directional meters are installed, net meters which may be used shall be of accuracy class 1.0 or better, or as per specification notified by the CEA. |
OTHER PROVISIONS |
Energy accounting and settlement |
|
Other charges | Exempted from banking, wheeling and cross subsidy. |
Penalty | As per the provisions of the Madhya Pradesh Electricity RegulatoryCommission (Distribution Performance Standards) (Revision-II) Regulations, 2012, as amended from time to time. |
Links | |
References | http://www.mperc.nic.in/061115-net-metering-regulation-eng.pdf |
About Portal
'All About Renewables' aims to bring about a change in the way we 'look and search' for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More
About
Useful Links
Contact
Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India
+91 20 26613855
+91 20 26613832