Kerala Renewable Energy and Net Metering Regulation 2020

  • / /

HIGHLIGHTS

 

Tariff Period & Useful life of plant

Technology

 No. of Years

Municipal solid waste (MSW) and refuse derived fuel (RDF) based power

20

Wind, solar PV , solar thermal

25

Small hydro

35

Biomass (Rankine cycle), non-fossil fuel cogeneration plant

20

Control Period

5 years, of which the first year shall be FY 2019-20.

   

Tariff (Rs./kWh)

  • Project specific tariff shall be determined for the following cases:
  • Small hydro projects (1 MW to 25 MW).
  • Renewable energy projects which have been commissioned before 31 March 2017 but for which no power purchase agreement has been signed till the 31 March 2017, the Project Tariff shall be determined on an annual basis.
  • Solar PV.
  • Wind energy.
  • MSW and RDF based projects with Rankine cycle technology.
  • Renewable-renewable and renewable-conventional sources for which renewable energy technology has been approved by MNRE.
  • Any other new renewable energy technologies approved by MNRE.
  • Financial and operational norms specified in the regulation will be ceiling norms.

 

Capital Cost

All capital costs are for FY 2018-19, and the same will remain valid for the entire duration of the control period unless reviewed earlier.

Technology

Capital Cost

(in Rs. lakh/MW)

Wind

Project specific

Small hydro below 500 kW

1400

Small hydro between 500 kW and 1 MW

1200

Solar PV

Project specific

MSW/RDF

Project specific

 

Capacity Utilization Factor

Technology

CUF

Wind

Annual Mean Wind Power Density (w/m2) at 100 meter hub-height

CUF

up to 220

22%

221-275

24%

276-330

28%

331-440

33%

>440

35%

Small hydro*

45%

Solar PV

    19%**

MSW/RDF

Stage

MSW

RDF

During Stabilization***

65%

65%

During the remaining period of the first year (after stabilization).

65%

65%

From 2nd year onwards.

75%

80%

*Normative CUF is net of free power, if any, to the home state.

**The Commission may deviate from the norm in case of project specific tariff

***The stabilization period shall not be more than 6 months from the date of commissioning of the project.

Auxiliary Consumption

Technology

Auxiliary Consumption

Wind

-

Small hydro

1%

Solar PV

       0.25%*

MSW/RDF

15%

* The Commission may deviate from the norms in case of project specific tariff determination.

 

Operation and Maintenance (O&M)Expenses

Technology

O&M Cost

(in Rs. Lakh/MW) for FY 2017-18

Wind

Project specific

Small hydro below 5 MW

38.06

Small hydro between 5 MW and 25 MW

28.54

Solar PV

Project specific

MSW/RDF

Project specific

O&M cost is escalated at 5.72% per annum over the tariff period.

Interest Rate on Loans

Average State Bank of India Marginal Cost of Funds based Lending Rate (one-year tenor) prevalent during the last available six months plus 200 basis points.

Depreciation

5.28% for the first 13 years and remaining depreciation spread over residual useful life of the project considering 10% of project cost as the salvage value of the project.

Return on Equity

14% to be grossed up by prevailing minimum alternate tax as on 1 April of  the previous year, for the entire useful life of the project.

Interest on Working Capital

Average State Bank of India Marginal Cost of Funds based Lending Rate (one-year tenor) prevalent during the last available six months plus 300 basis points.

Station Heat Rate (Only for MSW/RDF Projects)

4200 kCal/kWh.

Calorific Value (Only for RDF)

2500 kCal/kg.

Fuel Cost

RDF – Rs.1800/MT for FY 2018-19 to be escalated at 5% per annum.

MSW – No fuel cost.

 

 

Tariff structure and design

  • Generic or project specific.
  • Levelised.
  • Single part tariff for technologies not using fuel.
  • Single part with fixed cost and fuel cost component for technologies using fuel. 

Despatch Principles

  • All renewable energy power plants shall be treated as ‘MUST RUN’ power plants.
  • Scheduling of wind and solar energy shall be governed by:
  • Arunachal Pradesh State Electricity Grid Code, as amended from time to time
  • Central Electricity Regulatory Commission (Indian Electricity Grid Code) (Third Amendment) Regulations, 2015, as amended from time to time
  • Central Electricity Regulatory Commission (Deviation Settlement Mechanism and related matters) (Second Amendment) Regulations, 2015, as amended from time to time.

 

Subsidy or/and incentives by government

Any incentive or subsidy provided by the central or state government including accelerated depreciation benefit would be taken into consideration for determination of tariff.

Taxes and Duties

As pass-through, on actual incurred basis.

 

Rebate

  • 2% - for payment through Letter of Credit.
  • 1% - for payments not through Letter of Credit but within 1 month from the date of presentation of bills.

Late payment surcharge

1.25% per month for payment of bills beyond a period of 60 days from the date  of billing.

 

Control Period

From date of notification until 31 March 2021.

 

Renewable Purchase Obligation (RPO)

Year

Minimum quantum of purchase (%) from renewable energy sources (in kWh)

Solar

Non-solar

Total

2019-20

4.00

8.00

12.00

2020-21

5.25

9.00

14.25

2021-22

6.75

10.25

17.00

For FY 22 & FY 23 Commission will notify target later.

Obligated Entities

Distribution licensee, captive consumer with fossil fuel plant except DG set.

Ways to Meet RPO

  • Net metered consumers generated energy can be disposed towards licensee RPO, condition to services set i.e. purchased or banked.
  • Captive consumer can claim excess solar generation to meet non-solar RPO target.

 

Certificates

  • Obligation to fulfill RPO from non-solar and solar sources shall be fulfilled through purchase of non-solar and solar certificates, respectively.
  • Certificates purchased by obligated entities shall be submitted to the state agency in accordance with detailed procedure framed by the state agency.

 

Effect of Default

  • In case of failure to fulfil RPO, obligated entities may be directed by the Commission to deposit into a separate fund an amount as determined by the Commission based on the shortfall in units and forbearance price.
  • Fund so created shall be used only after approval by the Commission to purchase certificates or for any other purpose it may deem fit.
  • In case of genuine difficulty in fulfilling the RPO target, the obligated entity may appeal before the Commission to carry forward the residual RPO target to the next year.

 

About Portal

'All About Renewables' aims to bring about a change in the way we 'look and search' for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More

Contact

Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India

+91 20 26613855
+91 20 26613832