HIGHLIGHTS

 

Tariff Period

Technology

No. of Years

Wind

Not available

Mini-hydel

35

Bagasse based co-generation.

20

Biomass-based on Rankine cycle (water-cooled condenser).

20

Solar rooftop and small PV power plants, grid-connected megawatt-scale solar power plants.

25

 

Control Period

Technology

Period

Wind

1 April 2019 to 31 March 2020.

Solar rooftop and small PV power plants, grid-connected megawatt-scale solar power plants.

Mini-hydel, bagasse based co-generation, biomass-based on Rankine cycle (water-cooled condenser).

1 April 2018 to 31 March 2021.

MSW to Energy

19 September 2016 to 31 March 2019.

 

Useful Life of a Plant

Technology

No. of Years

Wind, solar rooftop and small PV power plants and grid-connected megawatt-scale solar power plants.

25

Mini-hydel

35

Bagasse based co-generation, biomass-based on Rankine cycle (water-cooled condenser), MSW to Energy.

20

 

Technology-wise Gross Tariff

Technology

Gross Tariff

(in Rs./kWh)

Wind

3.45

Mini-hydel

3.95

Bagasse based co-generation

Fixed cost

1.77

Variable cost (FY 2018-19)

1.82

Variable cost (FY 2019-20)

1.92

Variable cost (FY 2020-21)

2.03

Biomass-based on Rankine cycle (water-cooled condenser)

Fixed cost

2.19

Variable cost (FY 2018-19)

3.36

Variable cost (FY 2019-20)

3.55

Variable cost (FY 2020-21)

3.76

Biomass-based on Rankine cycle (air-cooled condenser)

Fixed cost

2.07

Variable cost (FY 2018-19)

3.28

Variable cost (FY 2019-20)

3.47

Variable cost (FY 2020-21)

3.66

Megawatt scale solar PV projects below 5 MW capacity, FY 2019-20

3.08

Solar rooftop PV projects of 1 kW to 2000 kW

Without capital subsidy

3.07

With capital subsidy

2.32

Domestic consumer   1 kW to 10 kW

Without capital subsidy

3.99

With capital subsidy

2.97

MSW to Energy

7.08

 

Capital Cost

Technology

Capital Cost

Wind (Rs.Lakh/MW)

575.00

Mini-hydel (Rs.Lakh/MW)

633.00

Bagasse based co-generation (Rs. Lakh/MW).

470.00

Biomass-based on Rankine cycle (water-cooled condenser) (Rs.Lakh/MW).

576.00

Biomass-based on Rankine cycle (air-cooled condenser) (Rs.Lakh/MW).

586.00

Solar rooftop and small PV power plants (Rs./kW).

45000.00

Grid-connected megawatt-scale solar PV plants (Rs.Lakh/MW).

340.00

1 kW to 2000 kW SRTPV non-domestic consumer (Rs./kW).

32800.00

MSW to Energy (Rs.Lakh/MW).

1700.00

 

Operation and Maintenance (O&M) Expenses

Technology

O&M Cost for FY 2018-19

Wind (Rs.lakh/MW)

10.00

Mini-hydel (Rs.lakh/MW)

14.66

Bagasse based co-generation (Rs.Lakh/MW).

14.10

Biomass-based on Rankine cycle (water-cooled condenser) (Rs.Lakh/MW).

28.80

Biomass-based on Rankine cycle (air-cooled condenser) (Rs.Lakh/MW).

23.44

Solar rooftop and small PV power plants (Rs.Lakh/kW)*

0.006

Grid-connected megawatt-scale solar PV plants (Rs.Lakh/MW)*

4.50

MSW to Energy (% of capital cost)

6%

*An annual escalation at the rate of 5.72% shall be considered.

Capacity Utilization Factor (CUF)

Technology

CUF (%)

Wind

29

Mini-hydel

30

Bagasse based co-generation.

60

Biomass based on Rankine cycle (water cooled condenser).

75

Biomass based on Rankine cycle (air cooled condenser).

75

Solar rooftop and small PV power plants.

19

Grid-connected megawatt-scale solar PV plants.

19

MSW to Energy

65 (1st year)

75 (balance useful life)

 

Auxiliary Consumption

Technology

Aux. Con. (%)

Wind

0.50

Mini-hydel

1.00

Bagasse based co-generation.

8.50

Biomass based on Rankine cycle (water cooled condenser).

10.00

Biomass based on Rankine cycle (air cooled condenser).

10.00

Solar rooftop and small PV power plants.

0.00

Grid-connected megawatt-scale solar PV plants.

0.25

MSW to Energy

12.00

 

Interest Rate on Loans

Technology

Rate of Interest (%)

Wind, solar rooftop and small PV power plants, grid-connected megawatt-scale solar PV plants.

10.50

Mini-hydel, bagasse based co-generation, biomass-based on Rankine cycle (water-cooled condenser), biomass-based on Rankine cycle (air-cooled condenser).

10.50

MSW to Energy

12.00

 

Depreciation

  • 5.38% for the first 12 years and 2.50% for the balance 8 years for MSW to energy plants.
    • 5.38% for the first 13 years and remaining depreciation spread over the residual useful life of the project for all other technologies.
    • 5.81% for ground-mounted and 5.38% for SRTPV for the first 13 years.

Return on Equity

  • 16% per annum for MSW to energy projects.
    • 14% with a tax on RoE as a pass-through for all other technologies.
    • 14% of RoE on equity amount of project.

Interest on Working Capital

Technology

Rate of Interest (%)

Wind, solar rooftop and small PV power plants, grid-connected megawatt-scale solar PV plants.

11.50

Mini-hydel, bagasse based co-generation, biomass-based on Rankine cycle (water-cooled condenser), biomass-based on Rankine cycle (air-cooled condenser).

11.50

MSW to Energy

12.50

 

Specific Fuel Consumption

Technology

Value (kg/kWh)

Bagasse based co-generation plant.

1.60

Biomass-based on Rankine cycle (water-cooled condenser).

1.21

Biomass-based on Rankine cycle (air-cooled condenser).

1.18

 

Fuel Cost

Technology

Cost (Rs./MT)

FY 2018-19

Bagasse based co-generation plant.

1,039.00

Biomass-based on Rankine cycle (water-cooled condenser).

2,500.00

Biomass-based on Rankine cycle (air-cooled condenser).

2,500.00

 

 

OTHER PROVISIONS

 

Tariff Structure and Design

Generic, single part, levelised tariff.

Merit Order Despatch Principle

Mini-hydel, wind.

Subsidy or/and Incentives by Government

Not available

Rebate

Not available

Late Payment Surcharge

Not available

Links

http://www.karnataka.gov.in/kerc/Pages/Generic%20Tariff%20Orders.aspx

http://www.karnataka.gov.in/kerc/Miscellaneous%20Orders%20%202018/Forms/AllItems.aspx?RootFolder=%2Fkerc%2FMiscellaneous%20Orders%20%202018%2FOrders%20-%202018&FolderCTID=0x0120002933890377E5CF48AAB0FF7E90C1F7C6&View=%7BD6DAD114-C388-4A03-A65C-CB64ED3A6CF1%7D&InitialTabId=Ribbon%2EDocument&VisibilityContext=WSSTabPersistence

References

http://www.karnataka.gov.in/kerc/Documents/RE%20Tariff%20Order%202018.pdf

http://www.karnataka.gov.in/kerc/Miscellaneous%20Orders%20%202018/Orders%20-%202018/Determination%20of%20tariff%20and%20other%20norms%20in%20respect%20of%20new%20Solar%20Power%20Projects.pdf

http://www.karnataka.gov.in/kerc/Miscellaneous%20Orders%20%202018/Orders%20-%202018/Generic-Tariff-for-Wind-Power-Project-2018.pdf

http://www.karnataka.gov.in/kercold/Downloads/COURT-ORDERS-2016/MSW_FINAL_Order-OP_20_2016-19.09.2016.pdf

https://www.karnataka.gov.in/kerc/Documents/Dated%2019.12.2018-%20Revision%20of%20tariff%20in%20respect%20of%20solar%20Rooftop%20of%20%201%20to%2010kW-Order.pdf

Solar Tariff order FY2019-20 Dated: 2019-08-19

https://www.karnataka.gov.in/kerc/Documents/Determination%20of%20tariff%20in%20respect%20of%20SOlar%20Power%20Projects%20(including%20Solar%20Rooftop%20Photovoltaic%20Projects%20for%20FY20.pdf

 

 

*Karnataka does not have technology-wise regulations. Data from different orders have been compiled in this summary.

 

About Portal

'All About Renewables' aims to bring about a change in the way we 'look and search' for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More

Contact

Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India

+91 20 26613855
+91 20 26613832