Tariff Period | Technology | No. of Years | |
Wind | Not available | ||
Mini-hydel | 35 | ||
Bagasse based co-generation. | 20 | ||
Biomass-based on Rankine cycle (water-cooled condenser). | 20 | ||
Solar rooftop and small PV power plants, grid-connected megawatt-scale solar power plants. | 25 | ||
| |||
Control Period | Technology | Period | |
Wind | 1 April 2019 to 31 March 2020. | ||
Solar rooftop and small PV power plants, grid-connected megawatt-scale solar power plants. | |||
Mini-hydel, bagasse based co-generation, biomass-based on Rankine cycle (water-cooled condenser). | 1 April 2018 to 31 March 2021. | ||
MSW to Energy | 19 September 2016 to 31 March 2019. | ||
| |||
Useful Life of a Plant | Technology | No. of Years | |
Wind, solar rooftop and small PV power plants and grid-connected megawatt-scale solar power plants. | 25 | ||
Mini-hydel | 35 | ||
Bagasse based co-generation, biomass-based on Rankine cycle (water-cooled condenser), MSW to Energy. | 20 | ||
| |||
Technology-wise Gross Tariff | Technology | Gross Tariff (in Rs./kWh) | |
Wind | 3.45 | ||
Mini-hydel | 3.95 | ||
Bagasse based co-generation | Fixed cost | 1.77 | |
Variable cost (FY 2018-19) | 1.82 | ||
Variable cost (FY 2019-20) | 1.92 | ||
Variable cost (FY 2020-21) | 2.03 | ||
Biomass-based on Rankine cycle (water-cooled condenser) | Fixed cost | 2.19 | |
Variable cost (FY 2018-19) | 3.36 | ||
Variable cost (FY 2019-20) | 3.55 | ||
Variable cost (FY 2020-21) | 3.76 | ||
Biomass-based on Rankine cycle (air-cooled condenser) | Fixed cost | 2.07 | |
Variable cost (FY 2018-19) | 3.28 | ||
Variable cost (FY 2019-20) | 3.47 | ||
Variable cost (FY 2020-21) | 3.66 | ||
Megawatt scale solar PV projects below 5 MW capacity, FY 2019-20 | 3.08 | ||
Solar rooftop PV projects of 1 kW to 2000 kW | Without capital subsidy | 3.07 | |
With capital subsidy | 2.32 | ||
Domestic consumer 1 kW to 10 kW | Without capital subsidy | 3.99 | |
With capital subsidy | 2.97 | ||
MSW to Energy | 7.08 | ||
Capital Cost | Technology | Capital Cost | |
Wind (Rs.Lakh/MW) | 575.00 | ||
Mini-hydel (Rs.Lakh/MW) | 633.00 | ||
Bagasse based co-generation (Rs. Lakh/MW). | 470.00 | ||
Biomass-based on Rankine cycle (water-cooled condenser) (Rs.Lakh/MW). | 576.00 | ||
Biomass-based on Rankine cycle (air-cooled condenser) (Rs.Lakh/MW). | 586.00 | ||
Solar rooftop and small PV power plants (Rs./kW). | 45000.00 | ||
Grid-connected megawatt-scale solar PV plants (Rs.Lakh/MW). | 340.00 | ||
1 kW to 2000 kW SRTPV non-domestic consumer (Rs./kW). | 32800.00 | ||
MSW to Energy (Rs.Lakh/MW). | 1700.00 | ||
| |||
Operation and Maintenance (O&M) Expenses | Technology | O&M Cost for FY 2018-19 | |
Wind (Rs.lakh/MW) | 10.00 | ||
Mini-hydel (Rs.lakh/MW) | 14.66 | ||
Bagasse based co-generation (Rs.Lakh/MW). | 14.10 | ||
Biomass-based on Rankine cycle (water-cooled condenser) (Rs.Lakh/MW). | 28.80 | ||
Biomass-based on Rankine cycle (air-cooled condenser) (Rs.Lakh/MW). | 23.44 | ||
Solar rooftop and small PV power plants (Rs.Lakh/kW)* | 0.006 | ||
Grid-connected megawatt-scale solar PV plants (Rs.Lakh/MW)* | 4.50 | ||
MSW to Energy (% of capital cost) | 6% | ||
*An annual escalation at the rate of 5.72% shall be considered. | |||
Capacity Utilization Factor (CUF) | Technology | CUF (%) | |
Wind | 29 | ||
Mini-hydel | 30 | ||
Bagasse based co-generation. | 60 | ||
Biomass based on Rankine cycle (water cooled condenser). | 75 | ||
Biomass based on Rankine cycle (air cooled condenser). | 75 | ||
Solar rooftop and small PV power plants. | 19 | ||
Grid-connected megawatt-scale solar PV plants. | 19 | ||
MSW to Energy | 65 (1st year) 75 (balance useful life) | ||
| |||
Auxiliary Consumption | Technology | Aux. Con. (%) | |
Wind | 0.50 | ||
Mini-hydel | 1.00 | ||
Bagasse based co-generation. | 8.50 | ||
Biomass based on Rankine cycle (water cooled condenser). | 10.00 | ||
Biomass based on Rankine cycle (air cooled condenser). | 10.00 | ||
Solar rooftop and small PV power plants. | 0.00 | ||
Grid-connected megawatt-scale solar PV plants. | 0.25 | ||
MSW to Energy | 12.00 | ||
| |||
Interest Rate on Loans | Technology | Rate of Interest (%) | |
Wind, solar rooftop and small PV power plants, grid-connected megawatt-scale solar PV plants. | 10.50 | ||
Mini-hydel, bagasse based co-generation, biomass-based on Rankine cycle (water-cooled condenser), biomass-based on Rankine cycle (air-cooled condenser). | 10.50 | ||
MSW to Energy | 12.00 | ||
| |||
Depreciation |
| ||
Return on Equity |
| ||
Interest on Working Capital | Technology | Rate of Interest (%) | |
Wind, solar rooftop and small PV power plants, grid-connected megawatt-scale solar PV plants. | 11.50 | ||
Mini-hydel, bagasse based co-generation, biomass-based on Rankine cycle (water-cooled condenser), biomass-based on Rankine cycle (air-cooled condenser). | 11.50 | ||
MSW to Energy | 12.50 | ||
| |||
Specific Fuel Consumption | Technology | Value (kg/kWh) | |
Bagasse based co-generation plant. | 1.60 | ||
Biomass-based on Rankine cycle (water-cooled condenser). | 1.21 | ||
Biomass-based on Rankine cycle (air-cooled condenser). | 1.18 | ||
| |||
Fuel Cost | Technology | Cost (Rs./MT) FY 2018-19 | |
Bagasse based co-generation plant. | 1,039.00 | ||
Biomass-based on Rankine cycle (water-cooled condenser). | 2,500.00 | ||
Biomass-based on Rankine cycle (air-cooled condenser). | 2,500.00 | ||
|
OTHER PROVISIONS |
Tariff Structure and Design | Generic, single part, levelised tariff. |
Merit Order Despatch Principle | Mini-hydel, wind. |
Subsidy or/and Incentives by Government | Not available |
Rebate | Not available |
Late Payment Surcharge | Not available |
Links | http://www.karnataka.gov.in/kerc/Pages/Generic%20Tariff%20Orders.aspx |
References | http://www.karnataka.gov.in/kerc/Documents/RE%20Tariff%20Order%202018.pdf Solar Tariff order FY2019-20 Dated: 2019-08-19
|
*Karnataka does not have technology-wise regulations. Data from different orders have been compiled in this summary.
About Portal
'All About Renewables' aims to bring about a change in the way we 'look and search' for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More
About
Useful Links
Contact
Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India
+91 20 26613855
+91 20 26613832