Control Period | 5 years of which the first year is FY 2012-13. | |||
Useful Life of a Plant |
| |||
Technology-wise Tariff (2014-15) | Technology | Net Tariff (Rs./kWh) | Net Tariff with Accelerated Depreciation (Rs./kWh) | |
Wind zone 1 (CUF – 20%) | 6.34 | 5.66 | ||
Wind zone 2 (CUF – 22%) | 5.76 | 5.14 | ||
Wind zone 3 (CUF – 25%) | 5.07 | 4.52 | ||
Wind zone 4 (CUF – 30%) | 4.23 | 3.77 | ||
Wind zone 5 (CUF – 32%) | 3.96 | 3.53 | ||
Small hydro below 5 MW | 4.46 | 4.10 | ||
Small hydro 5 MW to 25 MW | 3.80 | 3.47 | ||
Solar PV | 7.72 | 6.95 | ||
Solar thermal | 11.88 | 10.65 | ||
Biomass using other than rice straw and juliflora, and travelling grate boiler with water cooled condenser. | 7.42 | 7.25 | ||
Biomass using other than rice straw and juliflora, and travelling grate boiler with air cooled condenser. | Not available | Not available | ||
Biomass using other than rice straw and juliflora, and AFBC boiler with water cooled condenser. | Not available | Not available | ||
Biomass using other than rice straw and juliflora, and AFBC boiler with air cooled condenser. | Not available | Not available-- | ||
Non-fossil fuel based cogeneration | 5.94 | 5.73 | ||
Biomass gasifier | 6.55 | 6.42 | ||
Biogas | 7.40 | 7.16 | ||
Capital Cost | Technology | Capital Cost (FY 14-15) (Rs. lakh/MW) | ||
Wind | 603.93 | |||
Small hydro below 5 MW | 808.74 | |||
Small hydro (5 MW to 25 MW) | 735.21 | |||
Biomass projects based on Rankine cycle technology (with water cooled condenser and using other than rice straw and juliflora). | 544.19 | |||
Biomass projects based on Rankine cycle technology (with water cooled condenser, using rice straw and juliflora). | 594.57 | |||
Biomass based on Rankine cycle technology (with air cooled condenser and using other than rice straw and juliflora). | 584.50 | |||
Biomass based on Rankine cycle technology (with air cooled condenser, using rice straw and juliflora). | 634.88 | |||
Non-fossil fuel cogeneration | 440.71 | |||
Solar PV | 691.00 | |||
Solar thermal | 1200.00 | |||
Biomass gasifier | 577.12 | |||
Biomass gasifier (after considering capital subsidy). | 427.12 | |||
Biogas | 1154.20 | |||
Biogas (after considering capital subsidy). | 854.24 | |||
All capital costs (in Rs. lakh/MW) are for FY 2014-15 and shall be linked to respective indexation formula. | ||||
Operation and Maintenance Expenses (O&M) | Technology | Cost (FY 2014-15) (in Rs. lakh) | ||
Wind | 10.05 | |||
Small hydro below 5 MW | 27.94 | |||
Small hydro (5 MW to 25 MW) | 20.12 | |||
Biomass based on Rankine cycle technology. | 42.29 | |||
Non-fossil fuel based cogeneration. | 17.89 | |||
Solar PV | 12.30 | |||
Solar thermal | 16.77 | |||
Biomass gasifier and biogas | 44.71 | |||
5.72% p.a. escalation allowed. | ||||
Interest Rate on Loans | Average State Bank of India(SBI) base rate prevalent during first six months of the previous year plus 300 basis points. | |||
Depreciation | 5.83% for first 12 years and remaining depreciation spread over residual useful life of the project. | |||
Return on Equity |
| |||
Interest on Working Capital | Equivalent to the average State Bank of India base rate prevalent during the first six months of the previous year plus 350 basis points. |
OTHER PROVISIONS |
Tariff structure and design | Single part, levellised tariff for the tariff period, except for technologies with fuel cost component. |
Merit Order Dispatch Principle |
|
Subsidy or/and Incentives by government | Any incentive or subsidy provided by the central or state government including accelerated depreciation benefit would be taken into consideration. |
Rebate |
|
Late payment surcharge | 1.25% per month for payment of bills beyond a period of 60 days from the date of billing. |
Links | https://jerc.mizoram.gov.in/page/various-regulations-under-jerc-for-manipur-mizoram.html |
References | JERC for Manipur & Mizoram (Terms and Conditions for Tariff determination from Renewable Energy Sources) Regulations, 2010: https://jerc.mizoram.gov.in/downloads/file/217 First Amendment :https://jerc.mizoram.gov.in/downloads/file/250 Generic RE Tariff Order https://jerc.mizoram.gov.in/downloads/file/175 |
About Portal
'All About Renewables' aims to bring about a change in the way we 'look and search' for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More
About
Useful Links
Contact
Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India
+91 20 26613855
+91 20 26613832