Renewable Energy
Find latest News, Industry Updates, Markets, Finance, Policies and Regulations, Tenders
HIGHLIGHTS |
Control Period |
From the date of notification in the official gazette of Himachal Pradesh. |
|
Eligibility |
|
|
For consumers having sanctioned connected load |
Maximum capacity of solar PV project (% of sanctioned connected load) |
|
5 kW or less. |
100%. |
|
Exceeding 5 kW but not more than 10 kW. |
70% or 5 kW whichever is higher. |
|
Exceeding 10 kW. |
50% or 7 kW whichever is higher. |
|
|
||
Capacity Target for Distribution Licensee[A1] |
-- |
|
Metering Arrangement |
|
OTHER PROVISIONS |
Energy Accounting and Settlement |
|
Other Charges |
Exempted from wheeling, banking and cross subsidy surcharge for a period of five years. |
Penalty or Compensation |
As per Himachal Pradesh Electricity Regulatory Commission (Distribution Performance Standards) Regulations, 2010.
|
Link |
|
Reference |
http://hperc.org/File1/fsolarroof15.pdf http://new1.hperc.org/File1/drooftopsolar18.pdf
|
About Portal
'All About Renewables' aims to bring about a change in the way we 'look and search' for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More
About
Useful Links
Contact
Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India
+91 20 26613855
+91 20 26613832