Support, Grow, Contribute
All About Renewables

Renewable Energy

Find latest News, Industry Updates, Markets, Finance, Policies and Regulations, Tenders

Haryana Renewable Energy Tariff Regulations - 2010

  • / /

HIGHLIGHTS

 

Tariff Period Generally corresponding to project life or period provided in the PPA.
Control Period Second control period – 4 years, of which the first year would be FY 2013-14 (As per fourth amendment regulations, 2015).
Useful Life of a Plant

Technology

Years

Non-fossil fuel based co-generation, biomass, municipal solid waste to energy.

20

Wind, solar PV, solar thermal

25

Small hydro

35

 
Net Tariff Not available
Capital Cost

Technology

Capital Cost (in Rs. lakh/MW)†

Wind (FY 2013-14)

604

Small hydro below 5 MW (FY 2010-11)

550

Small hydro between 5 MW and 25 MW (FY 2010-11)

500

Biomass with water cooled condenser (FY 2013-14)

540

Biomass with air cooled condenser (FY 2013-14)

580

Non-fossil fuel cogeneration (FY 2010-11)

445

Solar PV with PV poly crystalline (FY 2014-15)

705

Solar PV with PV thin film and rooftop (FY 2014-15)

681

Solar PV canal top (FY 2014-15)

800

Solar thermal (FY 2013-14)

1200

MSW based on Rankine cycle technology (FY 2016-17)

1500

†All capital costs are determined for subsequent years using indexation formula given in the regulations except for solar technologies and MSW.

Operation and Maintenance (O&M) Expenses

Technology

O&M Cost (Rs. Lakh/MW) for First Year

Wind 6.50
Small hydro below 5 MW 17.00
Small hydro (5 MW to 25 MW) 12.00
Biomass 40.00 (FY 2013-14)
Non-fossil fuel cogeneration 13.35
Solar PV 9.00
Solar thermal 13.00
Municipal Solid Waste to Energy 6.5 of normative capital cost (FY 2016-17)
  • O&M cost is escalated at the rate of latest available WPI and CPI with weightage of 55% and 40%, respectively.
  • O&M cost of FY 2016-17 shall be escalated @5.72% per annum.
Interest Rate on Loans

Average State Bank of India long term prime lending rate/base rate prevalent during the previous year.

Depreciation

7% for first 10 years and remaining depreciation spread over the residual useful life of the project.

Return on Equity
  • 16% per annum on normative equity capital.
  • MAT and corporate tax shall be separately invoiced.
Interest on Working Capital

Average State Bank of India base rate prevalent during the first six months of the previous year plus 300 basis points.

Renewable Purchase Obligation (RPO)

Year

Minimum quantum of purchase (in %) from renewable energy sources

Solar

Non-solar

Total

2016-17

1.00

2.75

3.75

2017-18

1.25

2.75

4.00

2018-19

1.50

3.00

4.50

2019-20

2.00

2.75

4.75

2020-21

2.50

2.50

5.00

2021-22

3.00

2.50

5.50

 

  • Obligation to purchase renewable energy shall be inclusive of renewable energy purchase already being made.
  • Renewable energy purchase under power purchase agreement already entered into shall continue till its validity, even if the total renewable energy purchase exceeds RPO.
  • Compliance (FY 2015-16) - 73.90%
Obligated Entities

Distribution licensees, captive users and long term open access consumers in Haryana.

Ways to Meet RPO

Purchase of energy or certificates or a combination thereof.

Certificates
  • Obligations to fulfil solar and non-solar purchase shall be met by purchase of solar and non-solar certificates, respectively.
  • Certificates purchased shall be submitted to the Commission by the obligated entity in accordance with detailed procedures issued by the Central agency.

 

OTHER PROVISIONS

 

Tariff Structure and Design

Generic, single part, levellised tariff for the tariff period.

Merit Order Despatch

“Must run” – all renewable energy plants except biomass with capacity of 10MW and above and non-fossil fuel based co-generation plants.

Subsidy or/and Incentives by Government

Any incentive or subsidy provided by the central or state government including accelerated depreciation benefit would be taken into consideration for determination of tariff.

Rebate
  • 2% - for payment through Letter of Credit.
  • 1% - for payments not through Letter of Credit but within 1 month from the date of presentation of bills.
Late payment surcharge

1.25% per month for payment of bills beyond a period of 60 days from the date of billing.

State agency

Haryana Renewable Energy Development Agency (HAREDA).

Effect of default
  • The Commission may direct obligated entities who fail to fulfil their obligations and do not purchase certificates, to deposit an amount into a separate fund to be created and maintained by the obligated entity.
  • The amount to be deposited shall be determined based on the shortfall in RPO and forbearance price.
Monitoring and implementation framework Not available
Links https://herc.gov.in/Regulation/1.aspx
References https://herc.gov.in/writereaddata/pdf/20110203(1).pdf

https://herc.gov.in/writereaddata/pdf/20110905(1).pdf

https://herc.gov.in/writereaddata/pdf/20111125(1).pdf

https://herc.gov.in/writereaddata/pdf/r20140715.pdf

https://herc.gov.in/writereaddata/pdf/r20150812.pdf

https://herc.gov.in/writereaddata/pdf/r20161005.pdf

 

About Portal

'All About Renewables' aims to bring about a change in the way we 'look and search' for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More

Contact

Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India

+91 20 26613855
+91 20 26613832