HIGHLIGHTS |
Applicability |
|
Forecasting & Scheduling Code |
|
Role of QCA and Implementation |
|
Commercial and Deviation Settlement |
|
OTHER PROVISIONS |
Deviation Charges for intra state transaction (Generator connected to State Grid and selling power in the state) |
| |
Absolute Error in the 15 min time block | Deviation Charges payable to State DSM Pool | |
< = 10% | None | |
>10% but <=20% | At Rs. 0.50 per unit for the shortfall or excess energy for absolute error beyond >10% but <=20% | |
>20% but <=30% | As Above + Rs. 1.0 per unit for balance energy beyond 20% and upto 30% | |
> 30% | As above + Rs. 1.50 per unit for balance energy beyond 30% | |
| ||
Absolute Error in the 15 min time block | Deviation Charges payable to State DSM Pool | |
< = 15% | None | |
>15% but <=25% | At Rs. 0.50 per unit for the shortfall or excess energy for absolute error beyond >15% but <=25% | |
>25% but <=35% | As above + Rs. 1.0 per unit for balance energy beyond 25% and upto 35% | |
> 35% | As Above + Rs. 1.50 per unit for balance energy beyond 35% | |
Settlement for Interstate Transaction (Generator connected to State Grid and selling power outside the state) |
| |
Absolute Error in the 15 min time block | Deviation Charges payable to State DSM Pool | |
< = 15% | At the Fixed Rate for the shortfall energy for absolute error upto 15% | |
>15% but <=25% | As above + 110% of the Fixed Rate for balance energy beyond 15% and upto 25% | |
>25% but <=35% | As above + 120% of the Fixed Rate for balance energy beyond 25% and upto 35% | |
> 35% | As Above + 130% of the Fixed Rate for balance energy beyond 35% | |
| ||
Absolute Error in the 15 min time block | Deviation Charges payable | |
< = 15% | At the Fixed Rate for the excess energy for absolute error upto 15% | |
>15% but <=25% | As above + 90% of the Fixed Rate for excess energy beyond 15% and upto 25% | |
>25% but <=35% | As above + 80% of the Fixed Rate for excess energy beyond 25% and upto 35% | |
> 35% | As Above + 70% of the Fixed Rate for excess energy beyond 35% | |
Link | ||
Reference | http://www.aperc.gov.in/aperc1/assets/uploads/files/9bdd5-draft-regulation.pdf |
About Portal
'All About Renewables' aims to bring about a change in the way we 'look and search' for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More
About
Useful Links
Contact
Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India
+91 20 26613855
+91 20 26613832