Support, Grow, Contribute
All About Renewables

Renewable Energy

Find latest News, Industry Updates, Markets, Finance, Policies and Regulations, Tenders

CERC Normative parameters and Generic Tariff for RE Technologies for FY 2017-18

  • / /

HIGHLIGHTS
NORMATIVE PARAMETERS

 

 

Capital Cost

 

Technology

In lakh/MW (FY 2017-18)

Wind

Project specific Cost

Small hydro

Himachal Pradesh, Uttarakhand, NE states:

 

5 MW to 25 MW – Rs.900 Lakh/MW.

 

Other states:

 

5 MW to 25 MW – Rs 707 Lakh/MW.

Biomass power projects based on Rankine cycle technology.

Projects other than rice straw and juliflora (plantation) based projects.

Water cooled condenser – Rs.559.03 Lakh/MW

 

Air cooled condenser – Rs.600.44 Lakh/MW

Rice straw and juliflora (plantation).

Water cooled condenser – Rs.610.80 Lakh/MW

 

Air cooled condenser – Rs.652.20 Lakh/MW

Non-fossil fuel based cogeneration projects.

Rs.492.5 lakh/MW

Solar PV power projects.

Project Specific

Solar thermal

Project specific

Biomass gasifier power projects

Rs.592.88 lakh/MW

 

(After taking into account capital subsidy, net project cost shall be Rs. 442.88 lakh/MW for FY 2017-18).

Biogas based power projects

Rs.1185.76 lakh/MW

(After taking into account capital subsidy, net project cost shall be Rs.885.76 lakh/MW for FY 2012-13).

Power projects using municipal solid waste, projects using refuse derived fuel

Project specific

Operation and Maintenance Expenses

 

Wind

Project specific

Small hydro

Himachal Pradesh, Uttarakhand, NE states:

 

5 MW to 25 MW – Rs. 27 lakh/MW.

 

Other states:

 

5 MW to 25 MW – Rs.21 lakh/MW.

 

(escalated at the rate of 5.72% per annum)

Biomass power projects based on Rankine cycle technology.

Rs. 40 lakh/MW (5.72% escalation per annum)

Non-fossil fuel based cogeneration projects.

Rs.21.13 lakh/MW (5.72% escalation per annum)

Solar PV power projects.

Project specific

Solar thermal

Project specific

Biomass gasifier power projects.

Rs.52.83 lakh/MW (5.72% escalation per annum)

Biogas based power projects.

Rs.52.83 lakh/MW (5.72% escalation per annum)

Power projects using municipal solid waste.

Project specific

Power projects using refuse derived fuel.

 

Normative O&M expenses for FY 2015-16 shall be 6% of normative capital cost,
to be escalated @ 5.72% per annum.

Capacity utilization factor/Plant load factor

Wind

Annual Mean Wind Power Density (W/m2)

CUF/PLF

  

Upto 220

22%

221-275

24%

276-330

28%

331-440

33

> 440

35%

Small hydro

Himachal Pradesh, Uttarakhand, NE states

45%

Other states

30%

Biomass power projects based on Rankine Cycle technology

During stabilization

60%

During the remaining period of the first year (after stabilization).

70%

From 2nd year onwards

80%

Non-fossil fuel based cogeneration projects

Uttar Pradesh and

Andhra Pradesh

120 days (crushing) + 60 days (off-season) = 180 operating days.

45%

Tamil Nadu and

Maharashtra

180 days (crushing) + 60days (off-season) = 240 operating days.

60%

Other states

150 days (crushing) + 60days (off-season) = 210 operating days.

53%

 

Solar PV power project

 

19%

Solar thermal

 

23%

Biomass gasifier power projects

 

85%

Biogas based power projects

 

90%

Power projects using municipal solid waste

During stabilization (shall not be more than 6 months from date of commissioning)

65%

During the remaining period of the first year (after stabilization).

65%

From 2nd year onwards.

75%

Power projects using refuse derived fuel

During stabilization (shall not be more than 6 months from date of commissioning)

65%

During the remaining period of the first year (after stabilization).

65%

From 2nd year onwards.

80%

Auxiliary Consumption

Wind

N/A

Small hydro

1.0%

Biomass power projects based on Rankine Cycle technology

a) For the project using water cooled condenser:

i. first year of operation : 11%

ii. From 2nd year onwards : 10%

b) For the project using air cooled condenser:

i. During first year of operation : 13%

ii. From 2nd year onwards : 12%

Non-fossil  fuel  based Cogeneration Project

8.5%

Solar PV

0.25% of gross generation

Solar Thermal

10%

Biomass gasifier power projects

10%

Biogas based power projects

12%

Power projects using municipal solid waste, projects using refuse derived fuel

15%

Station Heat  Rate

Biomass power projects

  • For projects using travelling grate boilers : 4200 kCal/kWh
  • For projects using AFBC boilers : 4125 kCal/ kWh

Non-fossil  fuel  based Cogeneration Project - 3600 kCal / kWh

Power projects using municipal solid waste, projects using refuse derived fuel – 4200 kCal/kWh

Calorific Value

Biomass power projects - 3100 kCal/kg

Non-fossil  fuel  based Cogeneration Project - 2250 kCal / kg

Power projects using municipal solid waste, projects using refuse derived fuel – 4200 2500 kcal/kg

Links

http://www.cercind.gov.in/Current_reg.html

References

http://cercind.gov.in/2017/regulation/Noti131.pdf

 

GENERIC TARIFF

 

Technology

Levellised Fixed cost (Rs/kWh)

Variable Cost (Rs/kWh)

(1) Small Hydro

Himachal Pradesh, Uttarakhand, West Bengal and North Eastern States (below 5 MW)

5.07

Himachal Pradesh, Uttarakhand, West Bengal and North Eastern States (5 MW to 25 MW)

4.29

Other States (below 5 MW)

6

Other States ( 5MW to 25 MW)

5.04

(2) Biomass

Biomass Power Projects [other than Rice Straw and Juliflora (plantation) based project] with Water Cooled Condenser and travelling grateboiler

AP – 2.68

Haryana – 2.73

Maharashtra – 2.74

Punjab – 2.75

Rajasthan – 2.68

Tamil Nadu – 2.68

UP – 2.69

Others – 2.71

4.37

4.98

5.09

5.21

4.35

4.30

4.45

4.68

Biomass Power Projects [other than Rice Straw and Juliflora (plantation) based project] with Air Cooled Condenser and travelling grate boiler

 

AP – 2.83

Haryana – 2.89

Maharashtra – 2.90

Punjab – 2.91

Rajasthan – 2.83

Tamil Nadu – 2.83

UP – 2.84

Others – 2.86

4.47

5.09

5.21

5.33

4.45

4.40

4.55

4.79

Biomass Power Projects [Rice Straw and Juliflora (plantation) based project] with Water Cooled Condenser and travelling grate boiler

 

AP – 2.79

Haryana – 2.85

Maharashtra – 2.86

Punjab – 2.87

Rajasthan – 2.79

Tamil Nadu – 2.79

UP – 2.80

Others – 2.82

4.37

4.98

5.09

5.21

4.35

4.30

4.45

4.68

Biomass Power Projects [Rice Straw and Juliflora (plantation) based project] with Air Cooled Condenser and travelling grate boiler

 

AP – 2.95

Haryana – 3.01

Maharashtra – 3.02

Punjab – 3.03

Rajasthan – 2.95

Tamil Nadu – 2.95

UP – 2.96

Others – 2.98

4.47

5.09

5.21

5.33

4.45

4.40

4.55

4.79

Biomass Power Projects [other than Rice Straw and Juliflora (plantation) based project] with Water Cooled Condenser and AFBC boiler

 

AP – 2.68

Haryana – 2.73

Maharashtra – 2.74

Punjab – 2.75

Rajasthan – 2.67

Tamil Nadu – 2.67

UP – 2.68

Others – 2.70

4.30

4.89

5.00

5.11

4.27

4.23

4.37

4.59

Biomass Power Projects [other than Rice Straw and Juliflora (plantation) based project] with Air Cooled Condenser and AFBC boiler

AP – 2.83

Haryana – 2.88

Maharashtra – 2.89

Punjab – 2.90

Rajasthan – 2.82

Tamil Nadu – 2.82

UP – 2.83

Others – 2.85

4.39

5.00

5.12

5.23

4.37

4.32

4.47

4.70

Biomass Power Projects [Rice Straw and Juliflora (plantation) based project] with Water Cooled Condenser and AFBC boiler

AP – 2.79

Haryana – 2.84

Maharashtra – 2.85

Punjab – 2.86

Rajasthan – 2.79

Tamil Nadu – 2.78

UP – 2.79

Others – 2.81

4.30

4.89

5.00

5.11

4.27

4.23

4.37

4.59

Biomass Power Projects [Rice Straw and Juliflora (plantation) based project] with Air Cooled Condenser and AFBC boiler

 

AP – 2.95

Haryana – 3.00

Maharashtra – 3.01

Punjab – 3.02

Rajasthan – 2.95

Tamil Nadu – 2.94

UP – 2.95

Others – 2.97

4.39

5.00

5.12

5.23

4.37

4.32

4.47

4.70

Bagasse Based Co-generation Project

 

AP – 3.11

Haryana – 2.78

Maharashtra – 2.49

Punjab – 2.74

Tamil Nadu – 2.41

UP – 3.14

Others – 2.73

2.84

4.03

3.98

3.55

3.06

3.16

3.44

(3) Biomass Gasifier based Power Project

AP – 2.5

Haryana – 2.58

Maharashtra – 2.59

Punjab – 2.60

Rajasthan – 2.54

Tamil Nadu – 2.53

UP – 2.54

Others – 2.56

3.99

4.54

4.65

4.75

3.96

3.93

4.06

4.27

(4) Biogas based Power Projects

3.37

4.19

 

Links

http://cercind.gov.in/recent_orders.html

References

http://cercind.gov.in/2017/orders/O05.pdf



About Portal

'All About Renewables' aims to bring about a change in the way we 'look and search' for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More

Contact

Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India

+91 20 26613855
+91 20 26613832