Renewable Energy
Find latest News, Industry Updates, Markets, Finance, Policies and Regulations, Tenders
HIGHLIGHTS |
Control Period | From 2nd May, 2015. |
Eligibility Condition |
(As per Assam Electricity Regulatory Commission (Grid Interactive Solar PV Systems) Regulations 2015 (First Amendment), 2017) |
Capacity Target for Distribution Licensee | Available capacity should be (at least) the limit specified by the Commission from time to time. |
Metering | Net meters shall be of accuracy class 1.0 or better, or as per the specifications of the competent authority, and solar meters shall be of 0.2s class accuracy. |
OTHER PROVISIONS |
Energy accounting and settlement |
|
Other charges | Exempted from wheeling and cross subsidy surcharges. |
Penalty | Not available |
Link | http://www.aerc.nic.in/Regulations.htm |
Reference | http://www.aerc.nic.in/AERC-Grid%20Interactive%20Solar%20PV%20Systems%20Regulations-2015.pdf http://www.aerc.nic.in/AERC%20Grid%20Interactive%20Solar%20PV%20Systems%20Regulations%20-%202017.pdf
|
About Portal
'All About Renewables' aims to bring about a change in the way we 'look and search' for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More
About
Useful Links
Contact
Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India
+91 20 26613855
+91 20 26613832