Tariff Period | Technology | No. of Years | ||||
Municipal solid waste (MSW) and refused derived fuel (RDF) based power | 20 | |||||
Wind, solar PV | 25 | |||||
Small hydro | 35 | |||||
Control Period | 3 years, of which the first year shall be 2018-19. | |||||
Useful Life of a Plant | Technology | No. of Years | ||||
Municipal solid waste (MSW) and refused derived fuel (RDF) based power | 20 | |||||
Wind, solar PV | 25 | |||||
Small hydro | 35 | |||||
Tariff (Rs./kWh) | Project-specific tariff shall be determined in the following cases :
| |||||
Capital Cost | All capital costs are for 2017-18, and the same for subsequent years are determined using indexation formula given in Regulations. | |||||
Technology | Capital Cost | |||||
Wind | Project specific | |||||
Small hydro below 1 MW | Rs.1200 lakh/MW | |||||
Solar PV | Project specific | |||||
MSW/RDF | Project specific | |||||
| ||||||
Capacity Utilization Factor | CUF | |||||
Wind | Annual Mean Wind Power Density (w/m2) at 100 meter hub-height | CUF | ||||
Up to 220 | 22% | |||||
221-275 | 24% | |||||
276-330 | 28% | |||||
331-440 | 33% | |||||
>440 | 35% | |||||
Small hydro* | 55% | |||||
Solar PV | 19%** | |||||
MSW/RDF | Stage | MSW | ||||
During Stabilization*** | 65% | |||||
During the remaining period of the first year (after stabilization) | 65% | |||||
From 2nd year onwards | 75% | |||||
*Normative CUF is net of free power, if any, to the home state. **The commission may deviate from the norm in case of project-specific tariff. ***The stabilization period shall not be more than 6 months from the date of commissioning of the project. | ||||||
Auxiliary Consumption | Auxiliary Consumption | |||||
Wind | - | |||||
Small hydro | 1% | |||||
Solar PV | 0.25%* | |||||
MSW/RDF | 15% | |||||
* The commission may deviate from the norms in case of project-specific tariff determination. | ||||||
Operation and Maintenance (O&M)Expenses | Technology | O&M Cost for 2017-18 | ||||
Wind | Project specific | |||||
Small hydro below 1 MW | Rs.36 lakh/MW | |||||
Solar PV | Project specific | |||||
MSW/RDF | Project specific | |||||
O&M cost is escalated at 5.72% per annum over the tariff period. | ||||||
Interest Rate on Loans | Average State Bank of India marginal cost of funds based lending rate (one-year tenor) prevalent during last six months plus 200 basis points. | |||||
Depreciation | 5.28% for the first 13 years and remaining depreciation spread over the residual useful life of the project, considering 10% of the project cost as the salvage value of the project. | |||||
Return on Equity | 14% to be grossed up by prevailing Minimum Alternate Tax as on 1st April of previous years for the entire useful life of the project. | |||||
Interest on Working Capital | Average State Bank of India marginal cost of funds based lending rate (one-year tenor) prevalent during the last six months plus 300 basis points. | |||||
Station Heat Rate (Only for MSW/RDF Projects) | 4200 kCal/kWh | |||||
Calorific Value (Only for RDF) | 2500 kCal/kg | |||||
Fuel Cost | RDF – Rs. 1800/MT for 2018-19 to be escalated at 5% per annum. MSW – No fuel cost. |
OTHER PROVISIONS |
Tariff structure and design |
|
Despatch principles
|
|
Subsidy or/and incentives by government | Any incentive or subsidy provided by the central or state government including accelerated depreciation benefit would be taken into consideration for determination of tariff. |
Taxes and Duties | |
Rebate |
|
Late payment surcharge | 1.25% per month for payment of bills beyond a period of 60 days from the date of billing. |
Links | |
References | http://www.apserc.nic.in/pdf/Draft%20of%20RE%20regulation.pdf |
About Portal
'All About Renewables' aims to bring about a change in the way we 'look and search' for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More
About
Useful Links
Contact
Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India
+91 20 26613855
+91 20 26613832