Nodal Agency |
Uttar Pradesh New and Renewable Energy Development Agency (UPNEDA). |
Applicable Technologies |
Solar photovoltaic and solar thermal. |
Policy Period |
Date of issuance – till 31st March, 2017. |
Targets under Policy |
500 MW of grid-connected solar power by 2017. |
Incentive Amount |
|
Eligibility Conditions |
Minimum 5 MW |
Tax Exemptions |
Not available. |
Evacuation Arrangement |
Cost of transmission line up to the interconnection point shall be borne by the solar power project developer. The transmission line shall be constructed by the STU or DISCOM, whoever owns the feed-in substation. However, cost of transmission including cost of construction line, wheeling charges, losses etc., will be borne by the solar project developer. |
OTHER PROVISIONS |
Sale of Energy |
|
Single Window Clearance |
Nodal agency will act as single window clearance for solar power projects. Permissions, approvals, consents, required from the state government or its agencies for projects will be the main responsibility of the nodal agency as the single window. |
Links |
|
References |
http://upneda.org.in/sites/all/themes/upneda/pdf/SPOLICY-ENG-1-AMEND-01-08-14.pdff |
About Portal
'All About Renewables' aims to bring about a change in the way we 'look and search' for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More
About
Useful Links
Contact
Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India
+91 20 26613855
+91 20 26613832