Renewable Energy
Find latest News, Industry Updates, Markets, Finance, Policies and Regulations, Tenders
HIGHLIGHTS |
Nodal Agency |
Jammu and Kashmir Energy Development Agency (JAKEDA) |
Applicable Technologies |
Solar PV |
Policy Period |
Not available |
Targets for distribution licensee |
|
Installed Capacity |
Shall not exceed 50% of the consumer’s sanctioned load, provided min. capacity is >1 kWp and <500kWp |
Eligibility Conditions |
|
Application Fee |
Rs.100/kWp subject to a maximum of Rs.10,000 |
Net Metering |
The distribution licensee shall allow net-metering arrangement on first-cum-first served basis for self-owned and third party owned rooftop PV systems where the total capacity (in kWp) does not exceed the target capacity determined. |
Connectivity Evacuation Arrangement |
As per Central Electrical Authority (Technical Standards for connectivity of the Distributed Generation Resources) Regulations, 2013, as amended from time to time. |
OTHER PROVISIONS |
The state encourages third party models where developers can lease out solar equipment to rooftop owners and claim depreciation and direct tax benefits on the equipment.
Third party owned rooftop system, net metering model |
|
Connectivity and protection |
The interconnection of the Rooftop PV Solar Power Plant with the network of the distribution licensee shall be made as per the technical specifications and standards for connectivity provided in the Central Electrical Authority Regulations, 2013. Injection of power from the rooftop Solar PV system shall not be more than 90% of the total consumption of the consumer from the Licensee’s supply in a Settlement Period. |
Applicability of charges |
The rooftop solar system under net-metering arrangement, whether self-owned or third party owned, installed on eligible consumer premises, shall be exempted from banking and wheeling charges, losses, cross subsidy and additional surcharge, etc. |
Solar RPO |
The quantum of electricity consumed by the eligible consumer (not defined as obligated entity), under net-metering arrangement shall qualify towards compliance of RPO for the Distribution Licensee. |
Banking mechanism and billing |
|
Technical requirements, O&M guidelines |
The policy document has laid down technical and interconnection requirements and O&M practices to be followed. |
Links |
|
References |
http://jakeda.jk.gov.in/links/RTT%20policy%202016%20Final.pdf |
About Portal
'All About Renewables' aims to bring about a change in the way we 'look and search' for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More
About
Useful Links
Contact
Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India
+91 20 26613855
+91 20 26613832