Renewable Energy
Find latest News, Industry Updates, Markets, Finance, Policies and Regulations, Tenders
HIGHLIGHTS |
Nodal Agency |
Jharkhand Renewable Energy Development Agency. Role of the State Nodal Agency will be –
|
|||||||||
Targets |
Description |
Unit |
Financial Year |
Total |
||||||
2017-18 |
2018-19 |
2019-20 |
2020-21 |
2021-22 |
||||||
Rooftop Solar Power Plant* |
MW |
50 |
75 |
100 |
125 |
150 |
500 |
|||
* Minimum size of power plant at a single location will be 1 kW. |
||||||||||
Eligibility |
Any person including a company, body corporate, association, body of individuals will be eligible provided the plant is set up for following purposes –
|
|||||||||
Operative Period |
|
|||||||||
Scope |
Applicable to grid connected solar rooftop power plants and ground mounted small power plants (up to 500 kWp) commissioned within the premises of the consumers |
|||||||||
Tariff |
Shall be determined by the JSERC |
|||||||||
Incentives |
|
|||||||||
Third Party Sale |
Sale within the state as per the EA, 2003 and orders and regulations issued by JSERC |
|||||||||
CDM Benefits |
As per the provisions specified by JSERC |
|||||||||
Minimum Capacity Requirement |
Category of building / area |
Capacity of plant |
||||||||
|
Minimum 10% of connected load or 10 kWp, whichever is higher |
|||||||||
All private hospitals and nursing homes, industrial establishments, commercial establishments, malls, hotels, motels, banquet halls and tourism complexes having connected load of |
50 kW to 1000 kW (premises without diesel genset) |
Minimum 10% of connected load or 10 kWp, whichever is higher |
||||||||
Above 1000 kW (premises without diesel genset) |
Minimum 5% of connected load or 50 kWp, whichever is higher |
|||||||||
50 Kw to 1000 kW (premises with diesel genset) |
Minimum 10% of connected load or capacity equivalent to diesel genset whichever is higher |
|||||||||
Above 1000 kW (premises with diesel genset) |
Minimum 5% of connected load or capacity equivalent to diesel genset whichever is higher |
|||||||||
All new housing complexes developed by group housing societies, builders, housing boards, on a plot size of |
0.5 acre < plot size ≤ 1 acre |
Minimum 10 kWp |
||||||||
1 acre < plot size ≤ 2 acre |
Minimum 20 kWp |
|||||||||
2 acre < plot size ≤ 5 acre |
Minimum 30 kWp |
|||||||||
Plot size > 5 acre |
Minimum 40 kWp |
|||||||||
All water lifting/pumping stations of water resource department and drinking water and sanitation department having connected load of 100 kW and above |
Minimum 5% of connected load or 10 kWp, whichever is higher |
OTHER PROVISIONS |
Implementation Plan |
|
|
Role of Distribution Licensee |
|
|
Metering and Billing Arrangement |
|
|
Transformer Capacity |
Shall not exceed 100% of the rated capacity of the transformer (s). |
|
Evacuation Voltage |
Capacity of System |
Evacuation Voltage |
Less than 5 kW |
Single phase, 230 V |
|
5 kW < capacity ≤ 50 Kw |
Three phase, 415 V |
|
50 kW < capacity ≤ 1 MW |
6.6 kV/11kV |
|
Interconnection |
Guided by the provisions laid down by the DISCOM and approved by the JSERC |
|
Monitoring of Parameters |
|
|
Financial Arrangement and Support |
|
|
Empowered Committee |
An empowered committee under the chairmanship of the Chief Secretary, Government of Jharkhand shall oversee, monitor and resolve issues arising out of this policy. |
|
Link |
||
Reference |
http://jreda.com/tenders/pdf/2017/28_11_17_drft_of_solr%20_pwr_roftop%20_plcy.pdf |
About Portal
'All About Renewables' aims to bring about a change in the way we 'look and search' for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More
About
Useful Links
Contact
Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India
+91 20 26613855
+91 20 26613832