Renewable Energy
Find latest News, Industry Updates, Markets, Finance, Policies and Regulations, Tenders
HIGHLIGHTS |
Control Period | June 6, 2017 onwards | |
Eligible Entities |
| |
Power Evacuation |
| |
Power Evacuation Capacities |
| |
Bearer of Cost of Evacuation | Project Category | Cost Bearer |
Individual solar, wind, biomass, municipal solid waste and co-generation. | Entirely by the power producer. | |
Solar or wind projects under cluster scheme at 33 kV level. | Project developer | |
Solar or wind projects under cluster scheme at EHT level. | Project developer | |
Small hydro projects. |
| |
OTHER PROVISIONS |
Metering arrangement |
|
Cost of metering | Solar, wind, biomass, municipal solid waste, and co-generation projects – power producer shall bear the cost. |
Execution of work | Two options:
|
Testing, commissioning and synchronization with the grid |
|
Maintenance responsibilities |
|
Links | |
References | http://www.aperc.gov.in/aperc1/assets/uploads/files/d8537-gazettes-1496742983181.pdf |
About Portal
'All About Renewables' aims to bring about a change in the way we 'look and search' for data on renewables today, by providing access to the latest developments in the renewable energy sector (specifically renewable electricity), along with cross-linkages to the conventional energy sector, all on one single platform... Read More
About
Useful Links
Contact
Plot No.44, Hindustan Estates,
Kalyani Nagar, Pune 411 006, India
+91 20 26613855
+91 20 26613832